The Nicaragua Canal Its Design Final Location And Work Accomplished 1890

Cover The Nicaragua Canal Its Design Final Location And Work Accomplished 1890
The Nicaragua Canal Its Design Final Location And Work Accomplished 1890
A G Aniceto Garca Menocal
The book The Nicaragua Canal Its Design Final Location And Work Accomplished 1890 was written by author Here you can read free online of The Nicaragua Canal Its Design Final Location And Work Accomplished 1890 book, rate and share your impressions in comments. If you don't know what to write, just answer the question: Why is The Nicaragua Canal Its Design Final Location And Work Accomplished 1890 a good or bad book?
Where can I read The Nicaragua Canal Its Design Final Location And Work Accomplished 1890 for free?
In our eReader you can find the full English version of the book. Read The Nicaragua Canal Its Design Final Location And Work Accomplished 1890 Online - link to read the book on full screen. Our eReader also allows you to upload and read Pdf, Txt, ePub and fb2 books. In the Mini eReder on the page below you can quickly view all pages of the book - Read Book The Nicaragua Canal Its Design Final Location And Work Accomplished 1890
What reading level is The Nicaragua Canal Its Design Final Location And Work Accomplished 1890 book?
To quickly assess the difficulty of the text, read a short excerpt:

598 miles. It is proposed to retain the water in this basin at an elevation of 1 06 feet above sea level; in other words, the summit level of the Canal is carried across the "Divide" and extended to Lock No. 3, or to within 12 3-4 miles of the Atlantic, and but 3 1-2 miles from the sea level, which, as stated above, reaches 9 1-4 miles up from Greytown. The advantage of these two large reservoirs in close proximity to the locks need not be com- mented upon, and the facilities afforded as a "tur...n-out " for ships in waiting and traveling in opposite directions cannot be over-estimated. The dam is proposed to be built of stone or what is termed "rock-fill, " with earth backing, and will have a weir 600 feet long on the crest, and a fall of 45 feet for the discharge of the surplus water into the lower basin. This will be supplemented by another weir 800 feet long, located on the south side of the valley in a gap between the hills enclosing the upper basin, giving a total length of weir of 1, 400 feet.

What to read after The Nicaragua Canal Its Design Final Location And Work Accomplished 1890?
You can find similar books in the "Read Also" column, or choose other free books by A G Aniceto Garca Menocal to read online
MoreLess
10
Tokens
The Nicaragua Canal Its Design Final Location And Work Accomplished 1890
+Write review

User Reviews:

Write Review:

Guest

Guest