Totuskey River Virginia Letter From the Acting Secretary of War Transmitting

Cover Totuskey River Virginia Letter From the Acting Secretary of War Transmitting
Totuskey River Virginia Letter From the Acting Secretary of War Transmitting
United States. Army. Corps of Engineers
The book Totuskey River Virginia Letter From the Acting Secretary of War Transmitting was written by author Here you can read free online of Totuskey River Virginia Letter From the Acting Secretary of War Transmitting book, rate and share your impressions in comments. If you don't know what to write, just answer the question: Why is Totuskey River Virginia Letter From the Acting Secretary of War Transmitting a good or bad book?
Where can I read Totuskey River Virginia Letter From the Acting Secretary of War Transmitting for free?
In our eReader you can find the full English version of the book. Read Totuskey River Virginia Letter From the Acting Secretary of War Transmitting Online - link to read the book on full screen. Our eReader also allows you to upload and read Pdf, Txt, ePub and fb2 books. In the Mini eReder on the page below you can quickly view all pages of the book - Read Book Totuskey River Virginia Letter From the Acting Secretary of War Transmitting
What reading level is Totuskey River Virginia Letter From the Acting Secretary of War Transmitting book?
To quickly assess the difficulty of the text, read a short excerpt:


For chan- nel 80 feet wide.
Strawberry Hill Miles. 0. 8 1. 9 2. 6 3. 5 4. 1 5. 3 700 2, 100 4, 300 2, 200 1, 200 5, 100 6. 6 5. 0 5. 8 7. 2 5. 5 4. 5 7. 0 5. 9 6. 8 7. 5 6. 8 6. 0 Ca. Yds. 6, 200 29, 000 42, 000 14, 600 11, 800 90, 700 Cu. Yds. 5, 200 24, 100 35, 000 12, 200 9, 800 75, 600 Phillips Shipyard . . .
Mouth Total 6 bars 15, 600 194, 300 161, 900 1 1 i Not printed.
TOTUSKEY RIVEK, VIRGINIA. Six-foot project.
Center of bar below bridge.
Depth in feet.
Length in feet.
Ruling.
Average.
...For For channel channel 100 feet 80 feet wide. Wide.
Miles. Cu. Yds. Cu. Yds.
Bookers 1. 9 1, 600 ' 5. 0 5. 6 10, 000 8, 300 CoolSpring 2. 6 1, 100 5. 0 5. 7 6, 400 5, 300 Shipyard 4. 1 600 5. 4 5. 8 3, 200 2, 700 Mouth 5. 4 4, 600 4. 5 5. 0 41, 000 34, 100 TotaUbars | 7, 900 \ 60, 600 50~400 The estimated costs for the work along the four projects, with the estimated costs of annual maintenance, are shown in tabulated form as follows: One hundred feet wide and 8 feet deep.
194, 300 cubic yards of dredging, at 20 cents per cubic yard $38, 860 Engineering and contingencies, about 15 per cent 5, 840 Total 44, 700 Maintenance, $5, 000 yearly.


What to read after Totuskey River Virginia Letter From the Acting Secretary of War Transmitting?
You can find similar books in the "Read Also" column, or choose other free books by United States. Army. Corps of Engineers to read online
MoreLess
10
Tokens
Totuskey River Virginia Letter From the Acting Secretary of War Transmitting
+Write review

User Reviews:

Write Review:

Guest

Guest